Eaton PVE12 Instructions d'exploitation

Naviguer en ligne ou télécharger Instructions d'exploitation pour Pompes à chaleur Eaton PVE12. Eaton PVE12 Operating instructions Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - Piston Pumps

M-2854-SReleased 8/1/90Overhaul ManualPVE Variable Pump12–21 USgpm capacity at 1800 rpmVickers®Piston Pumps

Page 2 - Table of Contents

10External Valve Spool Orifice Size IncreasedIf the external valve spool orifice size is increased, pumpoutlet pressure will decrease, lowering force

Page 3 - Section I – Introduction

11Figure 5. Load Sensing Pressure Limiting Compensator (CVP, CVPC, CVPD)CompensatorSpringDrainCompensatorSpoolYoke Stroking PistonRotating GroupYoke S

Page 4

12Section IV – Installation and Operating Instructions A. Installation DrawingsThe installation drawing listed in Table 2 will show installationdimen

Page 5

13Sound LevelNoise is only indirectly affected by the fluid selection, but thecondition of the fluid is of paramount importance in obtainingoptimum re

Page 6 - Section II – Description

14Section V – Service and Maintenance A. Service ToolsThe following standard tools for overhauling the piston pumpare shown in Figure 8.Standard Tools

Page 7 - A. Piston Pump

15Figure 8. Standard Tools.123456Figure 9. Special Shaft Bearing Removaland Installation Tools.1.2321.500“A”Use for “A”Intermediate shaft bearing inst

Page 8 - D. Compensator

16Figure 11. Special Bearing Race Installation Tools.“C”“B”“A”.375NominalPipeSizeABC1 1/2” 4” 1.625 1.9002” 4” 2.125 2.375 Schedule 80 (extra he

Page 9

17G. Troubleshooting Table 3 lists the common difficulties experienced with pistonpumps and hydraulic systems. It also indicates probablecauses and re

Page 10

18Section VI – Overhaul A. GeneralCAUTIONBefore breaking a circuit connection, make certainthat power is off and system pressure has beenreleased. Low

Page 11

1955545352515049273060595857343536455554535251 5049273372237170444240343735312926254341393836283264656669746867Figure 13. PVE19/21 Exploded ViewRefer

Page 12 - D. Piping and Tubing

2Table of ContentsSection PageI. Introduction3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Page 13 - H. Start-Up

20Figure &IndexNo.UnitsperAssemblyDescription12345678910111213141516171819202122232425262728293031323334353637383940414243444541111111111111111111

Page 14 - Special Tools:

214567891012432725657585960616230255554535251504946474844452755545352515049Figure 13. PVE19/21 Exploded View

Page 15

22639108751211817161514134111923243221202269686771 707326293166434241403934383736353328326564

Page 16 - F. Replacement Parts

233. Inspect spring (8) and (16) for wear and parallelism.Spring ends must be parallel. Replace if spring is warped orwear is evident.4. Inspect seat

Page 17 - G. Troubleshooting

24Figure 14. Cylinder block subassembly disassembly tool.(Tighten nut, remove snap ring, loosen nut to relievespring tension).Figure 14a. Cylinder Blo

Page 18 - Section VI – Overhaul

25NOTEIf shims (51) were destroyed during disassembly, ayoke bearing preload adjustment must be made atassembly.c. Slide the yoke from side to side to

Page 19

26Figure 16. Removal of Front Bearing Race.Figure 17. Front Bearing Removal.ShaftSeal1 1/2” heavy wall tubing 6” long.See Figure 11.Arbor Press HereRe

Page 20

27a. Assemble pintle bearings (55) on each end of theyoke and insert bearing races (54).b. Install bearing spacer (53) at one pintle end.c. Install O-

Page 21

28H. Disassembly of Valve Block1. Do not disassemble check valve parts (64) through(66), unless action of the valve indicates a problem. Checkthe valv

Page 22

292. Install pipe plug (69) into valve block (26) and secure.3. Assemble a new O—Ring (68) on hex plug (67) andthread plug into place.K. Shaft Bearing

Page 23 - Rotating Group

3Section I – Introduction A. Purpose Of ManualThis manual describes operational characteristics andoverhaul information for the PVE12, 19(*) and thePV

Page 24 - Replacement

30Section VII – Test Procedure A. Test ConditionsFLUID MEDIUM: SAE 10W meeting API service classificationMS or equivalent.FLUID TEMPERATURE: 120°F ±5°

Page 25

31F. Performance Test of PVE12/19/21 Piston Pump with “CG”Compensator Control1. Operate pump at 1200 RPM. Set remote control valve tominimum pressure

Page 26 - G. Assembly of Housing Parts

32G. Performance Test of PVE12/19/21 Piston Pump with “CV”,“CVP”, “CVPC” and “CVPD”Compensator ControlNOTERefer to Figure 24 for location of circuit c

Page 27

33ModelCompensator Pressure Setting PsigTable 9. Load sensing compensator adjustment range.LockwireStandbyPressureP2P @USgpm(P2-P1)P @ CompensatorCrac

Page 28 - J. Assembly of Valve Block

4C-10 –CG-10 –CV-10 –CVP-12 –CVPC-12 –Pressure compensated(PVE19, 250-3000 psi)(PVE21, 250-2700 psi)Remote control pressurecompensator adjustablefrom

Page 29

5Figure 1. Sectional Views of the PVE PumpsDrive ShaftPVE19 Section ViewPVE12 Section ViewHousingRotating GroupTapered RollerBearingYokeWafer PlateCom

Page 30 - Section VII – Test Procedure

6Section II – Description A. GeneralAssembly of a typical pump package is shown in Figure 1.Six types of compensator subassemblies are used with thePV

Page 31 - Compensator Control

7Section III – Principles of Operation A. Piston PumpRotation of the pump drive shaft causes the cylinder block,shoe plate and pistons to rotate. See

Page 32 - H. Load Sensing Control Test

8Figure 3. Flat Cut-Off CompensatorCompensator SpringDrainPump LoadCross Hole (Open toSpring Area)Compensator SpoolYoke Stroking PistonRotating GroupY

Page 33 - Printed in U.S.A

9Figure 4. Load Sensing Compensator (CV).Compensator SpringDrainCompensator SpoolYoke Stroking PistonRotating GroupYoke SpringInletOutletActuatorLoadE

Commentaires sur ces manuels

Pas de commentaire